Persion Gulf Water Transmission Third Part - Right of way

Construction of Right of Way and Land Acquisition Supervision of part of Water Transmission Pipe Line from the Persian Gulf to the South East of the Country’s Mineral Industries national project (Third Part)

 

Project Specifications:

Client: Water Supply from Persian Gulf Co. (WASCO)

Contractor: 115K JV (115 Construction Co. (Inc.) & Kowsar Water Co.)

Consultant: Toossab Consulting Engineers Co.

Geographical scope of the Project: Between  Sarcheshmeh Copper Complex and Yazd Steel Industries and Chadormalou Mines Complex

Type of Contract: C

Date of Contract: 2016

Project Length: 12 Months

Project Progress: 100%

The total length of path: 350 Km

 